Basic Construction
Default chart configuration | applies (chart #3 in the chart screen) | ||
---|---|---|---|
|
| ||
|
|
Customisation
How you might customise your Time to Fill Report depends completely upon your requirements. It might be as simple as adding some key custom fields for each job or for filtering. Or it could be a really advanced rebuild using very specific timestamps and stages to reflect your processes.
Custom Fields | Custom Dates and Days Between |
---|---|
You can modify your report by adding relevant fields from your custom GQ folders as filters and/or fields. |
You can add other dates and measure the days between, however this can require some advanced configuration. Here are some key steps to follow.
|
Custom Charts | Optional Charts | |
---|---|---|
You can modify the existing charts or copy them by clicking the three vertical dots in the right corner of the chart thumbnail. If you would like to update or replicate this chart with your own days between measure, you’ll need to replace the above fields with your fields and repeat the above settings. |
Optional Charts
Additional Charts are included that you can add to your canvas, modify/copy or replace the existing chart on the canvas. | |
Time to Fill Distribution Shows the number of jobs by day range, and outliers. | Average Time to Fill Breakdown by Quarter Shows the average time to fill by quarter for each stage measured in the report. |
Custom Granularity | ||
---|---|---|
You can change the granularity of the report by |
:
|
It might then become a simple report that measures the average time to fill per (for example) group for the filtered date range. |
You will also need to |
complete the following steps. | ||
|
|
Your new chart might look something like this: | |
|
Additional options: You can colour your chart by your new field but you will need to rebuild it as a Stacked Vertical Column first. | ||
1. Change your chart type to a Stacked Vertical Column | 2. Re-add your fields as above and then add your field to the colour (aka color) box. | Your new chart might now look something like this: |
Updating Your Canvas
Modify your canvas on the Design page to reflect any new or optional charts that you’d like to use.