Using EXEC: Time to Fill
If you have defined your Time to Fill placeholder fields (and this has been updated in your view), the EXEC: Time to Fill report will automatically reflect these new definitions.
To create your own version, go to Report > Copy.
If you’re a system admin/super user, you can give yourself access to the original template and update this first. Go to Administration > Content > Templates subfolder and give yourself Edit access to edit the template.
Basic Construction
Dates and Days Included
The report lists each job where the Time to Fill End Date occurred in the last 12 months (by default). It will show:
The defined Time to Fill Start/End and days between
Request Submitted/Completed and days between
Job Creation Started/Completed and days between
Job Open/ Close and days between (or days to now if no close date)
Job Archive Date
Calculating Days Between
The Time to Fill (Days) calculation is done in the view configuration by Acendre based on the default definition or your updated definition.
The other day calculations are achieved by applying an advanced function against a duplicate of the later date column for the time period measured (eg Request Completed).
Default chart configuration (chart #3 in the chart screen) | |
---|---|
|
|
|
 |
Customisation
How you might customise your Time to Fill Report depends completely upon your requirements. It might be as simple as adding some key custom fields for each job or for filtering. Or it could be a really advanced rebuild using very specific timestamps and stages to reflect your processes.
Custom Fields | Custom Dates and Days Between |
---|---|
You can modify your report by adding relevant fields from your custom GQ folders as filters and/or fields. | You can add other dates and measure the days between, however this can require some advanced configuration. Here are some key steps to follow.
|
Custom Charts | Optional Charts | |
---|---|---|
You can modify the existing charts or copy them by clicking the three vertical dots in the right corner of the chart thumbnail. If you would like to update or replicate this chart with your own days between measure, you’ll need to replace the above fields with your fields and repeat the above settings. | Additional Charts are included that you can add to your canvas, modify/copy or replace the existing chart on the canvas. | |
Time to Fill Distribution Shows the number of jobs by day range, and outliers. Â | Average Time to Fill Breakdown by Quarter Shows the average time to fill by quarter for each stage measured in the report. |
Â
Custom Granularity | ||
---|---|---|
You can change the granularity of the report by:
It might then become a simple report that measures the average time to fill per (for example) group for the filtered date range. You will also need to complete the following steps. | ||
|
| Your new chart might look something like this: Â Â |
| ||
Additional options: You can colour your chart by your new field but you will need to rebuild it as a Stacked Vertical Column first. | ||
1. Change your chart type to a Stacked Vertical Column | 2. Re-add your fields as above and then add your field to the colour (aka color) box. | Your new chart might now look something like this: |
Â
Updating Your Canvas
Modify your canvas on the Design page to reflect any new or optional charts that you’d like to use.
Drag your charts and other canvas content from the left hand menu to the canvas.
Â
Move, resize, align or delete your canvas content as required.
Â
Â
Â